The building works are progressing well at our Box Hill South residential architectural renovation. The timber and steel framing works are now completed and the brickwork and external cladding is currently being installed. The project should reach lock-up stage soon so that internal services can start being roughed in. The new additions to this dwelling create a large open span flexible living area, which will look out over the backyard, swimming pool and associated entertaining spaces.
This extensive Box Hill South renovation retains and enhances the existing dwelling and adds a contemporary addition with a feature fireplace and large windows that look out over the backyard, swimming pool and associated entertaining spaces.
The construction stage of this Box Hill South renovation is expected to take 12 months.
Check back for some further updates as this exciting project progresses.